|
| |
Comply™ Gym Finish
350 VOC-Compliant OMU
(232SF)

Features
 |
Oil-modified urethane finish. |
 | Meets
strict federal and state guidelines (350 grams/liter) for VOC content.
|
 | Low
color, high gloss film provides beautiful, rich appearance without
darkening wood. |
 | Durable
finish designed for high traffic gymnasiums, racquetball and squash courts,
dance floors and other wood surfaces. |
 | Low
viscosity formula provides smooth application with a variety of applicators.
|
 | High
shine formula resists scuffs, rubber marks and dirt penetration.
|
Properties*
 |
Type - Oil-Modified Polyurethane |
 |
Form - Clear Liquid |
 |
Odor - Characteristic Urethane |
 |
Color - Light Amber |
 |
Weight per Gallon - 7.95 Lbs. |
 |
pH - N/A |
 |
Floor Solids - 52% |
 |
Coverage - Up To 500 Sq. Ft. Per Gallon (12 m2 per liter)
|
 |
Slip-Resistance -
UL Classified |
 |
V.O.C. Content - < 350 gm/l |
*
Properties are typical and subject to usual manufacturing tolerances.
General Directions**
For
maximum user safety and proper drying, always provide adequate exhaust while
using this product.
New Floors or Newly Sanded Floors:
- Pick-up
all dust and debris with vacuum. Follow with tack rag treated with
Waterless Cleaner
(#1130) to pick up all remaining dust.
- Apply
finish with lambs' wool applicator or weighted T-bar. Avoid puddling finish on
floor. Spread at a coverage rate of 500 square feet per gallon.
- Allow
floor to dry for 8 to 12 hours under normal conditions (24 hours max.). DO NOT
recoat if finish is tacky.
- Abrade
finish with a #2 steel wool pad.
- Tack
with a rag treated with Waterless Cleaner.
- Apply
game lines. Allow game paint to dry to heavy touch. Lightly abrade game lines
according to paint manufacturer's directions, then tack as indicated above.
- Apply
second coat of Comply™ in the same manner as the first. Allow to dry for 8-12
hours (24 hours max.), then abrade with a #2 steel wool pad, and tack as
indicated above.
- Apply
third coat of finish. Allow 72 hours before opening floor to light foot
traffic and 7 days before opening to normal athletic activities or heavy
traffic.
Recoating Existing Finish:
- Remove
all tape, labels and gum from floor.
- Dust
mop floor.
- Abrade
floor using 120 grit screens (wet method can be used, if desired).
- If
using wet method, make sure floor is thoroughly rinsed and completely dry
before proceeding.
- Tack
rag floor with lint-free towels and Waterless Cleaner.
- Apply
finish as indicated in step 2 under New Floors or Newly Sanded Floors.
- If two
coats are desired, abrade with #2 steel wool and tack rag with lint-free
towels and Waterless Cleaner. DO NOT recoat if first coat is still tacky.
- Allow
72 hours before opening floor to light foot traffic and 7 days before opening
to normal athletic activities or heavy traffic.
** See
label directions and MSDS for complete usage and safety instructions.
Application Hints
- Under
high humidity and high temperatures, dry times for Comply™ Gym Finish will
vary greatly. Do not apply a second coat if the first coat is still tacky.
- For
best results, apply finish at room temperature. Product applied under
60°F will become viscous and not flow properly.
Packaging Specifications
|
Package
|
Sizes
Available
|
UPC Codes
|
Pack
Size
(inches)
|
Cube
(ft.)
|
Pack
Wt.
(Lbs.)
|
Full
Pallet
|
|
|
5 Gallon
Metal Pail
|
783366232055
|
12 x 14
|
1.17
|
43.71
|
36
|
|